Hastings Deering Mackay

Status: Completed
Scope of works: Air Conditioning + Ventilation
Location: Mackay, Paget
Price range: $1M – $5M

For Hastings Deering, we delivered a complete air conditioning and ventilation solution designed to perform under the same high standards expected across mining-aligned facilities.

Scope of Works

The project included a new installation of:

Each element was integrated to support airflow, temperature control and operational performance across the workshop and warehouse spaces.

Staged Delivery to Support Operations

‍To maintain productivity on site, key systems were prioritised during construction. 9 x 20ft Big Ass Fans were commissioned early to improve airflow and comfort within the warehouse, while the Ground and Level 1 communications rooms were brought online ahead of schedule to allow data works to proceed without delay. This staged approach minimised disruption and supported continuous site activity.

‍

Compliance, Safety + Quality

‍Working within a facility aligned to mining industry standards required strict adherence to safety protocols across the workshop, warehouse and construction zones. Our experienced site team maintained rigorous quality control throughout the installation, minimising defects and delivering a complete system ready for independent commissioning. The result is a compliant, energy-conscious ventilation and air conditioning solution designed to operate reliably in a high-demand industrial environment.

Project Shots